37 °: Warn Hausbau - 3sat -Mediathek

37 °: Warn Hausbau - 3sat -Mediathek
Images
  • By deutschewhiskybrenner
  • 723 Views
Sie sind hier:
  1. 3sat
  2. company
  3. 37 degrees
  4. 37 °: Warn House building

company

37 °: Warn House building

Building has never been as attractive as today.Low interest rates make the home possible for many.Two young families are observed on their stony path into their own four walls.

Produktionsland und -jahr:
Deutschland2021
Datum:
Verfügbar
weltweit
Verfügbar bis:
bis 29.03.2024
Ton
UT
AD
TeilenHTML-Code zum Einbetten des Videos in der Zwischenablage gespeichert. Bitte beachten Sie die Nutzungsbedingungen von 3sat.
Verfügbar
weltweit
Verfügbar bis:
bis 29.03.2024
Ton
UT
AD

More

37 degrees

The protagonists were observed over the period of more than a year.The "37 °" film shows what different turns the dream of your own home can take, with many ups and downs.Will the calculation of both families end up in the end?

Marina and Mirko keep asking themselves this question.After three years of construction and over 100 controversial defects on their shell, they are at the end, emotional and also financially.The two-time parents had calculated 440,000 euros for their dream of their own house in Idar-Oberstein.In the meantime, however, the total costs are almost 600,000 euros.But the move -in date is still uncertain because the construction is simply not finished.In order to save rent in the construction phase, the 41-year-old Mirko, his three-year-old wife Marina, daughter Elena (4) and son Fabian (2), are accommodated in the house of Mirko's parents, including most of her household.The mood in the small apartment under the roof is always irritated.Because actually the stay with the parents was only intended as a short transition solution.And the desired excerpt is delayed, because Mirko and Marina have lost confidence in craftsmen.Mirko would therefore like to finish most of the work still outstanding at the house.But he is rather inexperienced and also very meticulous.All of this continues to delay the move -in.Therefore, everything is more time -consuming than expected.In the meantime, the bank is also putting pressure because the construction loan is bound to a catchment period.Hannah (30), medical student, and Niklas (32), mechatronics technician, was aware that they have to be emotional and financial compromises for their ecological dream house from the start.But building the free property of Hannah's family in Straubing-Bogen, Bavarian, was simply too attractive and in view of the rising rents in their previous residence in Regensburg for them also a reason for them.However, there is still construction costs of around 500,000 euros, which the family has to stem.Niklas is currently the sole earner of his family, which also includes daughter Amina (7), son Noam (3) and daughter Malea (1).The many small and large decisions come to the financial pressure, which the couple must agree on in the course of the construction planning.While Niklas decides quickly and out of his guts, Hannah thinks everything meticulously and several times.For example, over 600 upcoming decisions in sampling make a significantly more discussion substance than expected.But after all, you usually only build once in life.A sometimes expensive finding that not only demands these couples, but over 100,000 builders and buildings in Germany every year."37 °" accompanies two families for a year on their emotional journey into their own four walls.